Birmingham Road, Mount Evelyn - 041749-10VIC-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Apr 2014 - Jan 2015
Australian Government Contribution:$400,000
State:VIC

Project Description

The existing sealed road has deteriorated significantly, with rutting, cracking and potholes evident. Rehabilitation of the road surface is necessary. The roadway is a local collector road and carries significant traffic volumes for the area. Upgrading of the road will improve local amenity and safety of access for road users.

Rehabilitation of the existing sealed road pavement for a length of 460 metres from Hereford Road to Hull Road for a width of 6 metres together with to 7.0 metres, including kerb and channel work and drainage improvements to protect the road pavement.

Total cost of proposed project is $420,000

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/02/2015