Jump to Content

Lady McNess Drive - 042574-10WA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jun 2013 - Jul 2013
Australian Government Contribution:$650,000
Local Council/Shire:City of Armadale
State:WA

Project Description

The bridge has a timber deck that no longer complies with the requirements of todays traffic demand. The bridge has missing wooden guard rails. ** WA Special Bridge Program **

Repair bridge, upgrade barriers and approach slabs and construct reinforced concrete overlay Remove existing bridge decking and replace with 1300mm of reinforced concrete overlay to a length 33.15m and 8.20m in width. Replace the existing wooden guard rails and design the overlay for use by heavy vehicles (Class T44).

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/12/2013