Banjima Drive (Rural Road) - 044333-11WA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Dec 2011 - Jul 2013
Australian Government Contribution:$800,000
Local Council/Shire:Shire of Ashburton
State:WA

Project Description

Banjima Drive is an unsealed road which is deteriorating very quickly with corrugations, pot holes and loose gravel and continually requires to be graded and dampend down for safer driving conditions. The current condition of this road can be difficult at times, especially in the wet weather seasons when the dust component of the road either bogs into mounds that non-4 wheel drive vehicles would have difficulty in driving through or runs off leaving large open dangerous cracks.

Construct, stabilise and prepare for seal and complete required drainage, signage and guideposts.

Total cost of proposed project is $2,500,720

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.