Mutawintji Road (Rural Road). - 044850-11NSW-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Mar 2012 - Oct 2013
Australian Government Contribution:$160,825
State:NSW

Project Description

The road is unsealed and 6 floodways have been identified as low lying. After rain events the road surface becomes scoured through these floodaways and they often hold water, resulting in the road being impassable for several days until ponded water dries up and scouring can be rectified.

Top up gravel in causeways and stabilise the causeways.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2014