Jump to Content

Barnard Street, Denham WA - 045450-11WA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Apr 2012 - Sep 2014
Australian Government Contribution:$257,000
Local Council/Shire:Shire of Shark Bay
State:WA

Project Description

The existing chip seal surface has deteriorated and pot holed. Recent commercial development has seen the need to open Barnard Street to through traffic and provide on street parking and traffic calming devices.

Re-open Barnard Street to through traffic, replace one hundred metres of kerbing and install two hundred and fifty metres of kerbing to define on Street parking. Asphalt seal entire Street including on street parking areas. Install two traffic calming devices and an adjoining footpath of fifty metres in length. Increase street drainage capacity by installing six soakwells within the road reserve. Install solar street lighting.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/10/2014