Jump to Content

Neill Street - 046082-12VIC-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jan 2013 - Jun 2014
Australian Government Contribution:$510,000
Local Council/Shire:Central Goldfields Shire Council
State:VIC

Project Description

Neill Street is an Urban Collector road where the existing sealed road pavement, which is 224 metres long by 12 metres wide between kerbs, has failed. The road surface is rutted and heaved and has deteriorated since the adjacent properties have been developed into doctor's practices.

The existing pavement is to be removed between the existing kerbs and replaced with a new deeper pavement and the road bitumen sealed to provide a level safe surface in the urban environment. Some kerb renewal works will be undertaken to provide safer parking.

Total cost of proposed project is $560,000

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2014