Expected Start/Finish:Mar 2014 - Sep 2014
Australian Government Contribution:$614,398
Local Council/Shire:Corporation of the City of Norwood Payneham & St Peters
State:SA

Project Description

Road profile is not to current standards. Roadway surface has reached the end of its serviceable life. Kerbing and footpath on eastern side is undulating and in poor condition. Road lighting is poor.

Reconstruct 2789 sqm of road pavement,replace 676sqm of road surface with new 80mm thick paving,replace 2113sqm of road surface with 30mm thick hotmix paving, replace 868sqm of footpath with paving, replace 331m of kerbing. Upgrade drainage system to current required standards. Upgrade road lighting to current standards. Incorporate landscaping and water sensitive urban design features to roadway.

Total cost of proposed project is $1,679,070

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.