Greygum Crescent - 046663-12WA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:May 2013 - Jul 2013
Australian Government Contribution:$200,000
Local Council/Shire:City of Wanneroo
State:WA

Project Description

Substandard existing road carriageway, with limited stormwater drainage control. NOTE: This roads form part of "Old" Quinns Rocks that originally developed as a seaside holiday location and is now surrounded by new land subdivisonal development.

Rehabilitation of the existing carriageway (where required) and associated stormwater drainage system upgrade to urban subdivisonal standard for the full length of the road. Works will also include upgrade of existing kerbing, replacement of the existing footpath (where required) and reconnection of existing vehicle crossovers impacted by the drainage works.

Total cost of proposed project is $469,218

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.