Department of Infrastructure and Regional Development print logo Building our Future print logo

Leeches Gully Road (Rural Road) - 047532-12NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jan 2013 - Dec 2013
Australian Government Contribution:$51,849
Local Council/Shire:Tenterfield Shire Council
State:NSW

Project Description

The gravel road surface has been progressively lowered with grading causing drainage problems. The length of the road is 1300 metres and the width is 6 metres.

It is proposed to reconstruct the road by raising it with gravel from the side of the road.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/05/2014