Jump to Content

Arthur Street - 048415-12NSW-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jun 2013 - Jun 2014
Australian Government Contribution:$97,347
Local Council/Shire:Parramatta City Council
State:NSW

Project Description

The road is affected by potholes, failed pavement areas and cracks. There are also numerous patches that makes the road surface rough to drive on.

The proposed treatment includes replacement of failed areas with asphalt and resurfacing of the road by placing new layer of asphalt. Length = 232 m; Width = 12 m; Area = 2784 m2.

Total cost of proposed project is $184,495

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2014