Puti Drive (Main Road) - 048522-12NT-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:May 2013 - Mar 2014
Australian Government Contribution:$125,000
Local Council/Shire:Tiwi Islands Shire Council
State:NT

Project Description

Puti Driove is a main road in the community with a high level of daily traffic. The road is at risk of erdoing due to inadequate barriers between the road edge and the ocean. Currently, the waters edge is less than 3 metres from the edge of the existing bitumen road. Erosion is occuring at a rate of 200mm per annum.

Installation of a 4.5 metre deep x 125 metre long tapered solid rock and concrete wall. This will act as a barrier between the roads edge and the ocean and cease any further erosion. It will increase the distance between the ocean and the road to 7.5 metres.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/05/2014