Thompson Street, Tennant Creek NT - 048550-12NT-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Aug 2013 - Aug 2013
Australian Government Contribution:$20,117
Local Council/Shire:Barkly Shire Council
State:NT

Project Description

Thompson Street harbours both a major Child Care Centre and a Primary school. It is a high density traffic location where speeding does ocurr. To prevent a potential vehicular or vehicular/pedestrian accident, the current school crossing needs to be brought up to standard. Two speed humps will also be installed 50 metres either side of the crossing.

Installation of a raised pedestrian crossing, 4.5 x 9 metres and the installation of two proposed speed humps 50 metres distant from each side of the children's crossing will assist in the elimination of speeding vehicles and reduce, if not eliminate the potential for an accident.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/11/2013