Jump to Content

Gore Street, Orford - 048751-12TAS-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Mar 2014 - Jun 2014
Australian Government Contribution:$118,177
Local Council/Shire:Glamorgan Spring Bay Council
State:TAS

Project Description

Gore Street in the Orford township currently has a narrow bitumen seal with no kerbing. It has residential housing on both sides. Due to a lack of kerbing, stormwater infrastructure utilising existing roadside open drains are difficult to manage. The existing road formation has been failing for a number of years due to the lack of pavement material.

It is proposed to undertake full reconstruction works to the 270 metre section, including overall road widening to 7.50 metres, concrete kerb and gutter both sides and bitumen sealed. Stormwater will be addressed with the installation of new pits to discharge into an adjacent system.

Total cost of proposed project is $161,998

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2014