Jump to Content

Glengarry Road, Winkleigh - 048960-13TAS-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jan 2014 - Jun 2014
Australian Government Contribution:$228,361
Local Council/Shire:West Tamar Council
State:TAS

Project Description

The existing road is of variable width (4.5 to 5 metres wide including shoulders) and is considered narrow for the volume of traffic. The road is poorly drained and is a dust nuisance. The road carries a significant volume of truck traffic (gravel and logs) which is approximately 20%.

To reconstruct and seal 2 sections, 425 metres at the northern end near Winkleigh Road, and 1080 metres at the southern end near Frankford Road. The work proposed will widen the pavement to 7 metres including shoulders, seal gravel pavement to 6 metres wide and improve drainage.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2014