Jump to Content

Tukara Road, South Penrith - 049118-13NSW-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Oct 2013 - Mar 2014
Australian Government Contribution:$144,091
Local Council/Shire:Penrith City Council
State:NSW

Project Description

The road was originally constructed in 1979 and is showing signs of deterioration with numerous potholes and extensive failures due to the increasing traffic volume over the years.

It is proposed to carry out heavy patching of failed areas and asphalt surfacing for a length of 480 metres and a width of 10.2 metres

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/04/2014