Jump to Content

Six Mile Well Road - 049182-13SA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Feb 2014 - Apr 2014
Australian Government Contribution:$168,107
State:SA

Project Description

This road has been identified as a strategic road carrying large volumes of freight, in particular farm produce over the harvest period. Current state of the road is poor with minimal rubble depth with high maintenance requirements. Sealing 1.613 kilometres will complete sealing the entire length of the road.

The works will comprise the reconstruction of 1.613 kilometres of unsealed road and upgrade to a sealed road surface. This includes ripping and relaying the existing material, importing 250mm (compacted) of new base material to strengthen and widen the existing base. The road will be completed with a 7m two coat 14/7mm spray seal and 9m wide formation.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2014