Transport Mode:Road
Expected Start/Finish:Feb 2014 - Apr 2014
Australian Government Contribution:$131,286
State:SA

Project Description

The current condition of the road poses a safety issue with several areas of pavement deformation including large depressions causing excessive roughness. The road is also used extensively for cartage of produce in particular grapes and the excessive roughness contributes to damage of the produce while transporting.

The works will comprise the reconstruction of 0.9 kilometres of sealed road. The works will include ripping and relaying the existing material, importing 200mm (compacted) of new base material to strengthen and widen the existing base. The road will be completed with a 7m two coat 14/7mm spay seal and 9 metres wide formation.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2014