Griffin Crescent, Manning - 049252-13WA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Feb 2014 - May 2014
Australian Government Contribution:$83,153
Local Council/Shire:City of South Perth
State:WA

Project Description

The Transport Authority has established a primary bus route from the Canning Bridge train station Como through the suburb of Manning to Curtin University and the bus transit station on Campus with part of the route on Griffin Crescent that is only 5.5 metres wide for half its length and 6.5 metres for the balance and as a bus route needs to be widened to 7.5 metres but excludes any works to the roundabout at Challenger Avenue.

Widen the existing road pavement to 7.5 metres and rekerb on new alignment. Prepare existing surface to receive final wearing surface and apply Stone mastic Asphalt full width to minimsise the ongoing affect of pre-existing and localised "block cracking".

Total cost of proposed project is $212,223

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.