Jump to Content

Water Street - 049279-13NSW-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Dec 2013 - May 2014
Australian Government Contribution:$213,927
Local Council/Shire:Fairfield City Council
State:NSW

Project Description

The road surface is very old and brittle. It is affected by raveling of spray seal, cracks, some failures of road base course and deformation of road surface. Some sections of kerb & gutters have been displaced causing poor surface stormwater drainage.

The proposed work include the replacement of displaced sections of kerb & gutters, rehabilitation of road base with cement stabilisation, placement of spray seal over cemented base and resurfacing with hot mix asphalt. Length = 531m, Width = 10.2 m, Area = 5417m2

Total cost of proposed project is $436,312

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2014