Jump to Content

Cartledge Avenue - 049381-13SA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Oct 2013 - Apr 2014
Australian Government Contribution:$230,177
Local Council/Shire:Corporation of the City of Whyalla
State:SA

Project Description

There are three issues being addressed as part of this project. The first is the road surface which has substantially deteriorated and is well past its useful life, the second is poor drainage with Cartledge Avenue experiencing localised flooding particularly at the intersection of Cartledge Avenue and Barrie Robran Gate and the adjacent residential properties. Thirdly Cartledge Avenue from Heurich Terrace to Racecourse Road does not have any kerb and water table or footpath.

Work to be undertaken includes the construction of kerb and water table along Cartledge Avenue and installation of side entry pits and underground stormwater drainage to connect to the existing system along Racecourse Road (ASR Site). Reconstruct and reseal to strength base and renew surface. Install footpaths along Cartledge Avenue frontage of residential estate and introduce roundabout treatments at intersections of Heurich Terrace and Ekblom Street.

Total cost of proposed project is $275,504

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/05/2014