Jump to Content

Verran Terrace, Port Lincoln SA - 049603-13SA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Oct 2013 - Nov 2013
Australian Government Contribution:$163,674
Local Council/Shire:City of Port Lincoln
State:SA

Project Description

The existing road of surface of Verran Terrace has developed potholes and cracks and deteriorated beyond maintenance as a repair option. The road is a main route for heavy vehicles on the western entry into town and between industrial areas and the town and wharf areas. There is currently no kerbing on the railway corridor side of the road which creates drainage issues as the road edges are broken. There is also a new Bunnings development with main access from Verran Terrace, which will increase business and general use of the road.

The road will be reconstructed with a new base from Lebrun Street to Belair Drive and the surface will be hotmixed. There is currently no kerbing or guttering on the right hand (rail corridor side) of Verran Terrace. As part of the project kerbing will be constructed on this section to allievate drainage issues and future deterioration of the road shoulders. A footpath is not required at this point as there is a concrete footpath on the left hand side of Verran Terrace.

Total cost of proposed project is $312,391

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/03/2014