Department of Infrastructure and Regional Development print logo Building our Future print logo

Rankeys Hill Road, Hawthorndene - 049704-13SA-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Mar 2014 - Mar 2014
Australian Government Contribution:$158,641
Local Council/Shire:City of Mitcham
State:SA

Project Description

The existing road seal, and pavement are in poor condition showing signs of failure. The kerbing on both sides of the road is in good condition. The existing road surface has extensive areas of crocodile cracking indicating the underlying pavement has failed due to poor pavement strength. Rankeys Hill Road is a bus route with an estimated traffic volume of 1,775 vehicles per day

It is proposed to remove the road pavement and seal to a depth of 140mm and replace the pavement with 100mm of Asphalt and replace the seal with 40mm of Asphalt.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/05/2014