Jump to Content

Bond Street, Urban Road - 049935-13WA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Dec 2013 - Apr 2014
Australian Government Contribution:$50,404
Local Council/Shire:Shire of Donnybrook Balingup
State:WA

Project Description

Bond Street is an older street in an otherwise updated section of Donnybrook. Its bitumen surface has reached the end of its serviceable life. It is unkerbed and is drained via open drains which drain not only the stormwater from Bond Street itself but also streets above Bond Street. This, coupled with the fact that Bond Street is in a relatively steep area, creates ongoing and repeated issues with erosion and damage to the verge, road and private property in the area.

Reconstruct the subject section including the installation of underground concrete drainage systems. Slightly realign the road way and construct a new gravel pavement. Seal with a hot bitumen seal to 6.0 metres in width and install kerbing and reconstruct accesses to private property.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2014