Department of Infrastructure and Regional Development print logo Building our Future print logo

Vance Street, Dudley Park - 049983-13WA-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Nov 2013 - Jan 2014
Australian Government Contribution:$20,854
Local Council/Shire:City of Mandurah
State:WA

Project Description

The existing pavement wearing course has deteriorated to the extent where it is no longer considered serviceable. Extensive patching, stripping and localised surface defects exist across the entire road segment. The surface no longer performs its intended function of preventing moisture ingress into the unbound pavement base layers. Resurfacing is required to ensure the pavement structure is not compromised and the road can reach its intended design life.

Apply 25mm AC10 Hotmix Asphalt resurfacing treatment as per extend of works shown on locality diagram. Raise existing drainage pits to match new surface levels where required.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/03/2014