Strzelecki Track (Rural Road) - 050051-13SA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Aug 2013 - Jul 2014
Australian Government Contribution:$1,110,591
State:SA

Project Description

The floodways to be upgraded scour heavily after moderate flows and cause road closures. There are also significant maintenance costs associated with the re-instatement of these floodways.

The work will consist of excavating existing material and replacing with crushed rock, this will then be stabilised with cement and concrete toewalls will be constructed to prevent under-mining. The floodways vary in length from 100 to 200 metres and will be 10 metres in width.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/10/2014