Broughans Road (Finley) - 050209-13NSW-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jul 2013 - May 2014
Australian Government Contribution:$178,078
Local Council/Shire:Berrigan Shire Council
State:NSW

Project Description

This section of road is below adopted service width for the classification of road. the narrow seal width is creating dangerous condition for traffic that has to leave the sealed surface for passing traffic with edge drop offs from the sealed surface.

Works include construction of drainage structures, earthworks for adjustment of vertical and horizontal alignment and widening of formation, laying of road base pavement and application of a two coat bitumen seal. Total length is 1.245 km

Total cost of proposed project is $310,907

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/07/2014