Archibald Street - 050408-13WA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Dec 2013 - Jun 2014
Australian Government Contribution:$168,330
Local Council/Shire:Shire of Chittering
State:WA

Project Description

Due to increase in traffic volume,bitumen width is only 6 metres which is causing trucks to drive up onto footpath when passing other vehicles. School buses unable to pull off to do pickups as road is too narrow.

Increase bitumen seal width to 7.4 metres wide. Lay new kerbing and shift footpath across 1 metre. Install drainage down north side of road. Increase size of turning radi at both intersections to accommadate truck turning circles.

Total cost of proposed project is $170,060

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.