Jump to Content

Glenburgh Dalgety Downs Road - 050633-13WA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jul 2013 - Oct 2013
Australian Government Contribution:$323,458
Local Council/Shire:Shire of Upper Gascoyne
State:WA

Project Description

The existing road has significant amount of rock protruding onto the running surface causing a rough running surface for vehicles, irrespective of Maintenance Grading works. Drainage on this road is poor causing water to often lay on the road surface for extended periods of time after a rain event.

Works include gravel sheeting of the existing road surface to cover the existing protruding rock to create a smoother running surface. Drainage works will include creating new drains to prevent pooling of water.

Total cost of proposed project is $1,124,764

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/11/2013