Meaklim Street, Shepparton - 051220-13VIC-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Mar 2014 - Jun 2014
Australian Government Contribution:$240,504
Local Council/Shire:Greater Shepparton City Council
State:VIC

Project Description

Road pavement failure including depressions, crocidile cracking, and shoving as a result of water inundation into road pavement from kerb and channel failure

Replace kerb and channel on north and south side of street from Wyndham Street heading east for 338m. Total kerb and channel replaced will be 654 lineal metres. Road seal and pavement will be profiled out at 40mm, primed and sprayed with Strained Alleviated Membrane (SAM) seal. Supply and lay 10mm H-Asphalt at 40mm.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2014