Department of Infrastructure and Regional Development print logo Building our Future print logo

Wattle Avenue, Mandurah - 051469-13WA-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Mar 2014 - Mar 2014
Australian Government Contribution:$11,642
Local Council/Shire:City of Mandurah
State:WA

Project Description

The existing pavement wearing course has deteriorated to the extent where it is no longer considered serviceable. Extensive patching, stripping and localised surface defects exist across the entire road segment. The surface no longer performs its intended function of preventing moisture ingress into the unbound pavement base layers. Resurfacing is required to ensure the pavement structure is not compromised and the road can reach its intended design life.

Apply 25mm AC10 Hotmix Asphalt resurfacing treatment as per extent of works shown on locality diagram. Raise existing drainage pits to match new surface levels where required.

Total cost of proposed project is $17,338

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/05/2014