Department of Infrastructure and Regional Development print logo Building our Future print logo

Carnarvon-Mullewa Road - 051473-13WA-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Oct 2013 - Mar 2014
Australian Government Contribution:$382,589
Local Council/Shire:Shire of Murchison
State:WA

Project Description

Various sections need work to address the drainage and flood water runoff including problems with road heights and bunding. Sections also need reconstructing and resheeting whilst there. Water is currently flowing across sections of road causing erosion and road damage. Improvements will detour the water away from the road.

Works will be undertaken on a section starting 4.6km south of the intersection with the Beringarra-Byro Road and include work on two floodways to box them out and cement reinforce. Sections of the road will be reformed and gravel sheeted and one 500mt section will be reconstructed to allow the height of the road to be raised and a contour bank installed to allow water to be diverted away from the road. The works will improve the drainage and cause less damage to the roads in future weather events. The road is a gravel road with a 6 metre carriageway throughout the work area with widths increasing to 7 m through the floodways.

Total cost of proposed project is $403,005

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/05/2014