Terranora Road, Banora Point - 051484-13NSW-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Oct 2013 - Feb 2014
Australian Government Contribution:$250,938
Local Council/Shire:Tweed Shire Council
State:NSW

Project Description

The existing sealed road is in poor condition with numerous surface issues and pavement failures. Existing road drainage is poor. The road has a high accident rate with a fatality in 2009.

Reconstruction of the existing pavement and asphalt surfacing. Intall kerb and guttering on the top side of road and minor repairs to drainage inlet pits and pipes.

Total cost of proposed project is $670,042

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.