Jump to Content

Ferry Road - 051705-13QLD-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:May 2014 - Jun 2014
Australian Government Contribution:$245,025
Local Council/Shire:Northern Peninsula Area Regional Council
State:QLD

Project Description

Inadequate Road Profile, cross-fall and longitudinal drainage

The Proposed works would include re-profiling the main land access road into the NPA (Ferry Road). The re profiling would include:- i) increasing the cross-fall to allow for adequate run-off from the road and reduce water infiltration into the pavement, causing weak spots ii)Clearing out and or re-constructing longitudinal table drains beside the road formation to allow redirection of water to major cross drainage locations and protection of the pavement from water infiltration iii)Rectification works as required by the Superintendent along the road in preparation for sealing of the road. (It is proposed that complementary funding be sought to allow for the nominated section of Ferry Road to be sealed to allow an all weather access to the Northern Peninsula Area.)

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2014