Greigs Creek Road, Won Wron - 051987-14VIC-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Feb 2015 - Jun 2016
Australian Government Contribution:$301,906
Local Council/Shire:Wellington Shire Council
State:VIC

Project Description

Existing timber bridge is in the last stages of its useful life. Built to standards of more than 50 yrs ago with the increase in traffic volumes and weights of vehicles, the bridge is showing signs of wear and the structural integrity of the bridge elements has decrease to a point where it is currently load limited at 10T. The bridge also shows signs of termite damage. The bridge is for local access only.

To bring the bridge up to date with current standards, it is proposed to replace the existing bridge with concrete/steel structure, capable of supporting a minimum 23T.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/07/2016