Department of Infrastructure and Regional Development print logo Building our Future print logo

Cramphorne Road, South Yilgarn - 052011-14WA-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jan 2015 - May 2015
Australian Government Contribution:$370,948
Local Council/Shire:Shire of Yilgarn
State:WA

Project Description

The existing road surface is made up principally of loose sand and clay based material that is slippery when wet.

In an effort to rectify this problem, it is proposed to carry out reconstruction of the existing road surface to upgrade to a seven metre bitumen prime seal standard. This work involves importing of gravel from designated gravel pits and improving the road surface drainage along with water binding gravel road pavement and laying of a seven metre bitumen prime seal. Project Length - two and a half kilometres.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/07/2015