Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Dec 2014 - Apr 2015
Australian Government Contribution:$442,398
Local Council/Shire:City of Mitcham
State:SA

Project Description

The kerb and water table on both sides of Carruth Road are displaced both vertically and horizontally due to soil movement and tree growth. The road pavement is significantly deformed due to the reactive sub-grades in the area. Carruth Road is classified as a collector road with a vehicle traffic volume of 2,377 vehicles per day.

It is proposed to replace all of the kerbing on both sides of Carruth Road. The kerb replacement will be followed by the removal of the road seal and pavement. The road will be replaced with a 100mm Asphalt pavement followed with 40mm Asphalt seal. The project includes the replacement of an existing roundabout at the intersection of Barrelder Road and Carruth Road.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2015