Jump to Content

Griffith Street, Kelmscott - 052156-14WA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Nov 2014 - Mar 2015
Australian Government Contribution:$32,845
Local Council/Shire:City of Armadale
State:WA

Project Description

Existing asphalt surface is over 25 years old and is cracking. The kerb on both sides is also damaged due to age.

The proposed treatment is to crack seal for the full length and width i.e. 190m*7.0m, remove and replace kerb for the full length along both sides, resurface with 25mm thick stone mastic asphalt and adjust all drainage pits.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/05/2015