Department of Infrastructure and Regional Development print logo Building our Future print logo

Scott Road, Kelmscott - 052158-14WA-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Nov 2014 - Mar 2015
Australian Government Contribution:$107,311
Local Council/Shire:City of Armadale
State:WA

Project Description

Existing rural road with a chip seal wearing course is aged over 25 years and is cracked and stripping. The existing shoulders on both sides are also rutted and with edge break up over the full length of works.

The proposed treatment is to crack seal for the length of 550m, resurface with 30mm stone mastic asphalt for the full width of 5.5m, regrade and compact the shoulders on both sides for a width of 500mm and install guide posts in accordance with Australian Standards.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/10/2015