Jump to Content

Clematis Road, Mount Evelyn - 052469-14VIC-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Dec 2014 - May 2017
Australian Government Contribution:$361,144
State:VIC

Project Description

The existing road has a crushed rock formation requiring ongoing maintenance, with residents experiencing problems associated with dust, corrugations and potholes. The road services abutting urban residential properties. Construction of the existing unmade road will improve the amenity and quality of access for these properties.

Construction of the full length of the road (650 metres). The width of the works will generally be 5 metres, to match the existing road formation. The road will be constructed with an asphalt surface and kerb and channel and drainage to carry stormwater run-off.

Total cost of proposed project is $909,926

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2017