Edison Parade - 052545-14NSW-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jan 2015 - Jan 2015
Australian Government Contribution:$51,848
Local Council/Shire:Parramatta City Council
State:NSW

Project Description

The existing road surface is old, brittle and prone to cracking. Some sections of kerbs and gutters have been displaced by tree roots. Due to numerous cracks and other surface defects, the road is noisy and rough to drive on.

The proposed work will include repair of damaged sections of kerbs and gutters, repair of failed pavement areas and resurfacing with asphalt. Length = 279 m; Width = 8.8 m; Area = 2455 m2.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/05/2015