Department of Infrastructure and Regional Development print logo Building our Future print logo

Binya Street - 052547-14NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jan 2015 - Jan 2015
Australian Government Contribution:$38,077
Local Council/Shire:Parramatta City Council
State:NSW

Project Description

The existing road surface is old and brittle. It has been affected by cracks and potholes especially at the joint between two different pavement materials.

The proposed work will include repair of potholes and pavement failures and resurfacing of the road with asphalt. Length = 158 m; Width = 8.2 m; Area = 1296 m2.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/05/2015