Jump to Content

Goroke Harrow Road - 052778-14VIC-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Oct 2014 - May 2016
Australian Government Contribution:$260,597
Local Council/Shire:West Wimmera Shire Council
State:VIC

Project Description

The road surface is narrow, rough and uneven. This affects the trafficability and safety of the road which is a haulage route for farm trucks

The section of road will be reconstructed for a total length of 1265m. The existing surface will be ripped and crushed and pavement material added to give an overall pavement width of 6.8m. The surface will be prepared and sealed with bitumen for a width of 6.2m A final wearing sealed surface will be applied in March 2016 on the road for a length of 1265m and a width of 6.2m to protect the road formation from water, provide drainage and create a non skid surface

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2016