Department of Infrastructure and Regional Development print logo Building our Future print logo

Keechs Road (rural road), - 052910-14NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Aug 2014 - Oct 2014
Australian Government Contribution:$77,814
Local Council/Shire:Warrumbungle Shire Council
State:NSW

Project Description

The surface of Keeches Road in the proposed work location is unsealed and does not have sufficient road base, which results in potholes and ruts, which reduces the speed at which vehicles may travel along the road. Furthermore, the existing surface becomes slippery during and after rainfall.

Overlay the surface of the entire 8km length of Keechs Road with 100mm compacted road base material

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/05/2015