Bayside Avenue, Edithvale - 052943-14VIC-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Nov 2014 - Jun 2015
Australian Government Contribution:$586,181
Local Council/Shire:Kingston City Council
State:VIC

Project Description

Rigid road pavement is in poor condition and has failed for approximately 60% of the roads length; it has extensive cracking and heaving failures. Kerb & channel is greater than 75% disjointed and requires replacing. A major drainage upgrade is required and will be incorporated into this project.

Construction works will include the following: • 5900m² of excavation for road pavement, indented carparking, footpaths and vehicle crossings, • 2800m² of asphalt pavement, • 4000m² of asphalt wearing course, • 1270m of concrete kerb & channel and flood dish • 950m² concrete footpath paving • 600m² concrete vehicle crossings • 150m² of concrete indented parking • 700m of drainage 225mm to 600mm Dia. Pipes • 400m of drainage 750mm to 1050mm Dia. Pipes • associated drainage pits

Total cost of proposed project is $1,340,168

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.