Jump to Content

Bendee Street - 053119-14NSW-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jul 2014 - Dec 2014
Australian Government Contribution:$11,442
Local Council/Shire:Narrandera Shire Council
State:NSW

Project Description

Undulated kerb, deteriorated nature strip and driveway not meeting the required slope. A lot of elderly population comes to Barellan Club and there was safety issue.

Realign the kerb for proper drainage, remove 30-40 mm of existing surface in nature strip and replace with asphalt

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2015