Conrad Street, St. Albans - 053120-14VIC-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Mar 2015 - Jun 2015
Australian Government Contribution:$322,744
Local Council/Shire:Brimbank City Council
State:VIC

Project Description

The existing road pavement exhibits oxidation and areas of significant longitudinal and crocodile cracking, loss of aggregate and patching. In addition the road has no underground drainage.

It is proposed to rehabilitate 330 metres of existing road pavement and resurface with asphalt, reconstruct 668 metres of existing kerb and channel, reconstruct existing vehicle crossings where required, construct 514 metres of underground drainage works and reconstruct of all footpath.

Total cost of proposed project is $555,035

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.