Banjima Drive (rural road) - 053202-14WA-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jul 2014 - Dec 2014
Australian Government Contribution:$621,345
Local Council/Shire:Shire of Ashburton
State:WA

Project Description

Banjima Drive has been sealed up to the 20 kilometre point and the continued sealing of the final 8 kilometres completes the sealing of the Shire owned length of this road. The existing road is gravel and grading is now difficult due to the rock exposure from years of grading and major rutting of the road. Use of the road has become a difficult for tourists especially those towing caravans accessing the campsites and a lot of damages to vehicles and caravans has been reported.

Construct, stabilise and prepare for seal, then seal. Completion of required drainage, signage and guideposts.

Total cost of proposed project is $1,700,000

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.