Kerinaiua Highway, Wurrumiyang - 053308-14NT-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Nov 2014 - Jan 2015
Australian Government Contribution:$56,294
State:NT

Project Description

Failure in asphalt due to a combination of heavy vehicle articulation and stormwater drainage failure. This is the main heavy traffic route between the barge landing where products are delivered then transported to the Community

Rebuild intersection with 150mm thick structural concrete slab to avoid future articulation damage. Rerun aged/damaged 450mm concrete stormwater pipes through to exit point on foreshore(60 meters).

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/11/2015