Jump to Content

Ninth Avenue, Llandilo - 053625-14NSW-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Nov 2014 - Apr 2015
Australian Government Contribution:$204,276
Local Council/Shire:Penrith City Council
State:NSW

Project Description

The road was originally constructed in 1979 and is showing signs of deterioration with numerous potholes and failures due to the increasing traffic volume over the years.

It is proposed to stabilise the existing pavement to a depth of 250mm and provide a 2 coat seal for a length of 1220 metres and width of 6.5 metres.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2015