Department of Infrastructure and Regional Development print logo Building our Future print logo

Wirrinya Road (Rural Road) - 054662-14NSW-RTR

Funding Program:Roads to Recovery Program
Status:In planning
Transport Mode:Road
Expected Start/Finish:Jun 2017 - Dec 2017
Australian Government Contribution:$790,000
Local Council/Shire:Forbes Shire Council
State:NSW

Project Description

The shoulders are devoid of gravel, creating a hazardous edge drop. The existing sealed pavement has a lot of cracking and is rough in sections. The road has an average of 111 vehicles per day, of which 32% of these are heavy vehicles. The high percentage of heavy vehicles indicates it is used as a freight route.

Widen pavement to 2 lanes (9m formation), overlay and strengthen existing pavement. Renew large culvert structure. Add new line marking, signs and delineation.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/02/2017